Project:ADA Rail Bridge
Location:Serbia
Product used:ISOTRACK L
Challenge:
  • Ongoing track maintenance required installation of suitable surface for operation of vehicles.
  • Weight limitation preventing use of options such as concrete
Solution:
Customer benefits:
  • Cost savings compared to using more traditional road-building materials
  • Fast installation (also able to cut / trim to size)
  • Easy to uplift / relocate if required